Pyramid Peak Water Treatment Plant
Glendale, AZ
This project upgraded and replaced multiple components on critical plant systems to provide a higher level of resiliency and redundancy. The scope included upgrades to the service water system, new service water feed line and related components, replacement of the potable water pumps, replacement of the chlorinators and related components, installation of a chlorine dioxide generator, sodium chlorite pumps and replacement of the 36” buried backwash water valve.
Engineer
Black & Veatch