Children's Hospital of Orange County New Patient Tower
Orange, CA
Estadísticas del Proyecto
Cliente
Children's Hospital of Orange County
Estado del Proyecto
Completar
Mercados
Built to serve the expanding needs of the region, this 425,524-square-foot patient tower provides leading-edge technology and advanced programs and services in a child-friendly, healing environment. Located on the south side of the existing CHOC Children’s hospital site, McCarthy served as general contractor for the project, which included construction of the seven–level patient tower plus a basement as well as a penthouse chiller room and helistop. Prior to construction, an office building and two-level parking structure were removed to make way for the new tower. McCarthy also renovated 50,000 square feet of the existing facility and supporting central plant components in the basement of the existing north tower.
Designed to be one of the most advanced, safest children’s hospitals in the world, the state-of-the-art tower includes the region’s only dedicated pediatric operating rooms, emergency department, imaging department and laboratory. Building Information Modeling (BIM) technology in conjunction with the design-assist delivery method were used early in the design phases of the CHOC Children’s project to coordinate the tower’s intricate drawings for the mechanical, electrical, plumbing (MEP) and other related systems.
Awards and Recognition
2013 Best Project, Healthcare
Engineering News-Record, California
2014 Alliant Build America Award
Best New Building
![An open interior area with a balcony overlooking the floor below](/sites/default/files/styles/full_width_slide_sm_mobile_1x/public/2023-04/CHOC-New-Patient-Tower-211.jpg?h=9782657d&itok=nazn0SW9)
![A front desk area with blue wall in the background](/sites/default/files/styles/full_width_slide_sm_mobile_1x/public/2023-04/CHOC-New-Patient-Tower-212.jpg?h=9782657d&itok=SdJRgf6z)
![People sitting at tables in a dining area](/sites/default/files/styles/full_width_slide_sm_mobile_1x/public/2023-04/CHOC-New-Patient-Tower-215.jpg?h=9782657d&itok=iirZVP3y)
![A patient room with bed, equipment, and large glass windows bringing in light](/sites/default/files/styles/full_width_slide_sm_mobile_1x/public/2023-04/CHOC-New-Patient-Tower-218.jpg?h=9782657d&itok=o_P4Jlzl)
![Long desk area with computers and blue wall in the background](/sites/default/files/styles/full_width_slide_sm_mobile_1x/public/2023-04/CHOC-New-Patient-Tower-219.jpg?h=9782657d&itok=iFxBV3kQ)
![A hallway with patient rooms on the left and nurses' station on the right](/sites/default/files/styles/full_width_slide_sm_mobile_1x/public/2023-04/CHOC-New-Patient-Tower-221.jpg?h=9782657d&itok=6rYrYC2a)
![Patient areas with curtains in between each bed.](/sites/default/files/styles/full_width_slide_sm_mobile_1x/public/2023-04/CHOC-New-Patient-Tower-222.jpg?h=9782657d&itok=0CVjXmFb)
Construction Manager
Jacobs
Architect
CannonDesign