Port Houston Bayport Wharf 6
Seabrook, TX
Estadísticas del Proyecto
Cliente
Port of Houston Authority
Estado del Proyecto
En Curso
Mercados
The Port Houston Authority Wharf 6 project is at the Bayport Container Terminal in Seabrook, Texas. It includes construction of a new 1,000-foot-long wharf that will allow for the latest generation of container cranes to unload shipping containers from neo-Panamax vessels. The project scope includes the installation of drilled shaft foundations, both pre-cast and cast-in-place concrete, crane rail installation, ship fender and mooring systems, substantial dirt work and dredging activities. Construction on Wharf 6 began in May 2021 and is projected to be complete in July 2023. The project is directly attached to the Wharves 4 and 5 Rehabilitation project that McCarthy completed.
![Aerial view of the container terminal with ships moving down the waterway](/sites/default/files/styles/full_width_slide_sm_mobile_1x/public/2023-04/Bayport-Wharf-6-07.jpg?h=9782657d&itok=GvqrQWk9)
![Aerial view of the container terminal with waterway in the foreground](/sites/default/files/styles/full_width_slide_sm_mobile_1x/public/2023-04/Bayport-Wharf-6-11.jpg?h=9782657d&itok=tIauxo8p)
Engineer
Jacobs